U.S. Department of Labor
Occupational Safety and Health Administration
Houston South Area Office
17625 El Camino Real, Suite 400
Houston, TX 77058
Phone: (281)286 0583 FAX: (281)286 6352
This Citation and Notification of Penalty (this Citation) describes violations of the Occupational Safety and Health Act of 1970. The penalty(ies) listed herein is (are) based on these violations. You must abate the violations referred to in this Citation by the dates listed and pay the penalties proposed, unless within 15 working days (excluding weekends and Federal holidays) from your receipt of this Citation and Notification of Penalty you mail a notice of contest to the U.S. Department of Labor Area Office at the address shown above. Please refer to the enclosed booklet (OSHA 3000) which outlines your rights and responsibilities and which should be read in conjunction with this form. Issuance of this Citation does not constitute a finding that a violation of the Act has occurred unless there is a failure to contest as provided for in the Act or, if contested, unless this Citation is affirmed by the Review Commission or a court.
Posting - The law requires that a copy of this Citation and Notification of Penalty be posted immediately in a prominent place at or near the location of the violation(s) cited herein, or, if it is not practicable because of the nature of the employer's operations, where it will be readily observable by all affected employees. This Citation must remain posted until the violation(s) cited herein has (have) been abated, or for 3 working days (excluding weekends and Federal holidays), whichever is longer. The penalty dollar amounts need not be posted and may be marked out or covered up prior to posting.
Informal Conference - An informal conference is not required. However, if you wish to have such a conference you may request one with the Area Director during the 15 working day contest period. During such an informal conference you may present any evidence or views which you believe would support an adjustment to the citation(s) and/or penalty(ies).
If you are considering a request for an informal conference to discuss any issues related to this Citation and Notification of Penalty, you must take care to schedule it early enough to allow time to contest after the informal conference, should you decide to do so. Please keep in mind that a written letter of intent to contest must be submitted to the Area Director within 15 working days of your receipt of this Citation. The running of this contest period is not interrupted by an informal conference.
If you decide to request an informal conference, please complete, remove and post the page 4 Notice to Employees next to this Citation and Notification of Penalty as soon as the time, date, and place of the informal conference have been determined. Be sure to bring to the conference any and all supporting documentation of existing conditions as well as any abatement steps taken thus far. If conditions warrant, we can enter into an informal settlement agreement which amicably resolves this matter without litigation or contest.
Right to Contest - You have the right to contest this Citation and Notification of Penalty. You may contest all citation items or only individual items. You may also contest proposed penalties and/or abatement dates without contesting the underlying violations. Unless you inform the Area Director in writing that you intend to contest the citation(s) and/or proposed penalty(ies) within 15 working days after receipt, the citation(s) and the proposed penalty(ies) will become a final order of the Occupational Safety and Health Review Commission and may not be reviewed by any court or agency.
Penalty Payment - Penalties are due within 15 working days of receipt of this notification unless contested. (See the enclosed booklet and the additional information provided related to the Debt Collection Act of 1982.) Make your check or money order payable to "DOL-OSHA". Please indicate the Inspection Number on the remittance.
OSHA does not agree to any restrictions or conditions or endorsements put on any check or money order for less than the full amount due, and will cash the check or money order as if these restrictions, conditions, or endorsements do not exist.
Notification of Corrective Action - For violations which you do not contest, you should notify the U.S. Department of Labor Area Office promptly by letter that you have taken appropriate corrective action within the time frame set forth on this Citation. Please inform the Area Office in writing of the abatement steps you have taken and of their dates, together with adequate supporting documentation, e.g., drawings or photographs of corrected conditions, purchase/work orders related to abatement actions, air sampling results, etc.
(Please see attached "Corrective Action Verification")
Employer Discrimination Unlawful - The law prohibits discrimination by an employer against an employee for filing a complaint or for exercising any rights under this Act. An employee who believes that he/she has been discriminated against may file a complaint no later than 30 days after the discrimination occurred with the U.S. Department of Labor Area Office at the address shown above.
Employer Rights and Responsibilities - The enclosed booklet (OSHA 3000) outlines additional employer rights and responsibilities and should be read in conjunction with this notification.
Notice to Employees - The law gives an employee or his/her representative the opportunity to object to any abatement date set for a violation if he/she believes the date to be unreasonable. The contest must be mailed to the U.S. Department of Labor Area Office at the address shown above and postmarked within 15 working days (excluding weekends and Federal holidays) of the receipt by the employer of this Citation and Notification of Penalty.
Corrective Action Verification
Dear Sir or Madam:
OSHA's inspections are intended to result in the abatement/correction of violations of the OSHAct. To verify that this has been accomplished, Section 1903.19 requires that an employer certify to OSHA, within ten (10) days of the final abatement date that each item cited has been corrected.
This abatement certification letter must include the following:Name of Employer
OSHA Inspection Number
Citation and Item Numbers to which the submission relates
The date each item was abated, specific action taken to abate each violation and appropriate documentation for the action taken. Where appropriate, this documentation should include photographs, work orders, purchase orders, personal protective equipment provided, standard operation procedures, copies of written programs, engineering controls, monitoring data, etc. Adequate supporting documentation may allow us to close the case file. The lack of adequate documentation could result in a follow-up inspection.
A statement that affected employees and their representatives have been informed of the abatement actions
A statement that the information submitted is accurate
The signature of the employer or the employer's authorized representative.
Following is a sample format that may be used for this submittal:
Name of Employer
| Citation Number |
Item No. Instance No. |
Date Item Abated |
Corrective Action Taken |
Date this letter of submission posted
I certify that the information submitted is correct.
___________________________________ Employer or Authorized Representative
NOTICE TO EMPLOYEES OF INFORMAL CONFERENCE
An informal conference has been scheduled with OSHA to discuss the citation(s) issued on 10/29/2009. The conference will be held at the OSHA office located at Houston South Area Office, 17625 El Camino Real, Suite 400, Houston, TX, 77058 on _____________ at _____________. Employees and/or representatives of employees have a right to attend an informal conference.
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 1a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 1b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 2a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 2b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 3a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 3b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 4a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 4b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 5a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 5b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 6a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 6b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 7a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 7b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 8a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 8b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 9a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 9b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 10a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 10b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 11a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 11b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 12a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 12b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 13a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 13b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 14a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 14b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 15a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 15b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 16a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
a. In the Ultracracker Unit, the inlet line pressure drop on pressure relief valve 246 P did not comply with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code.
Citation 1 Item 16b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 17a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 17b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 18a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 18b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 19a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 19b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 20a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 20b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 21a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 21b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 22a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 22b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 23a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 23b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 24a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 24b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 25a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 25b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 26a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 26b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 27a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 27b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 28a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 28b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 29a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 29b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 30a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 30b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 31a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 31b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 32a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 32b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 33a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 33b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 34a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 34b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 35a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 35b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 36a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 36b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 37a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 37b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 38a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 38b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 39a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 39b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 40a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 40b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 41a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
a. In the Ultracracker Unit, the inlet line pressure drop on pressure relief valve 53 P did not comply with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code.
Citation 1 Item 41b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 42a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 42b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 43a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 43b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 44a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 44b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 45a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 45b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 46a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 46b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 47a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 47b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 48a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 48b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 49a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 49b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 50a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 50b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 51a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 51b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 52a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 52b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 53a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 53b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 54a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 54b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 55a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 55b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 56a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 56b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 57a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 57b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 58a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 58b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 59a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 59b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 60a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 60b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 61a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 61b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 62a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 62b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 63a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 63b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 64a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 64b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 65a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 65b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 66a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 66b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 67a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 67b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 68a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 68b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 69a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 69b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 70a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 70b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 71a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 71b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 72a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 72b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 73a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 73b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 74a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 74b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 75a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 75b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 76a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 76b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 77a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 77b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 78a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 78b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
a. In the Pipestill 3B Unit, the inlet line pressure drop on pressure relief valve 806R was outside acceptable limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 79a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 79b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 80a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 80b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 81a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 81b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 82a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 82b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 83a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 83b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 84a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 84b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 85a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 85b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 86a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 86b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 87a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 87b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 88a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 88b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 89a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 89b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 90a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 90b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 91a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 91b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 92a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 92b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 93a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 93b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 94a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 94b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 95a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 95b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 96a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 96b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 97a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 97b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 98a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 98b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 99a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 99b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 100a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 100b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 101a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 101b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 102a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 102b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 103a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 103b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 104a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 104b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 105a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 105b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 106a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 106b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 107a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 107b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 108a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 108b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 109a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 109b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 110a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 110b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 111a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 111b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 112a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 112b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 113a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 113b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 114a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 114b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 115a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 115b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 116a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 116b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 117a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 117b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 118a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 118b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 119a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 119b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 120a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 120b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 121a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 121b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 122a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 122b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 123a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 123b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 124a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 124b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 125a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 125b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 126a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 126b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 127a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 127b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 128a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 128b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 129a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 129b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 130a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 130b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 131a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 131b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 132a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 132b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 133a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 133b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 134a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 134b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 135a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 135b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 136a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 136b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 137a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 137b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 138a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 138b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 139a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 139b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 140a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 140b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 141a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 141b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 142a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 142b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 143a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 143b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 144a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 144b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 145a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 145b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards including documenting that each pressure relief valve and associated piping has been evaluated and, if necessary, repaired or replaced to ensure outlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 146a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 146b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 147a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 147b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 148a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 148b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 149a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 149b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 150a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 150b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 151a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 151b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 152a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 152b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 153a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 153b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 154a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 154b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 155a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 155b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 156a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 156b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 157a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 157b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 158a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 158b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 159a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 159b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 160a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 160b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 161a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 161b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 162a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 162b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 163a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 163b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 164a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 164b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 165a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 165b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 166a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 166b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 167a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 167b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 168a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 168b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 169a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 169b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 170a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 170b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 171a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 171b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 172a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 172b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 173a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 173b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 174a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 174b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 175a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 175b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 176a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 176b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 177a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 177b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 178a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 178b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 179a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 179b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 180a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 180b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 181a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 181b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 182a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 182b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 183a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 183b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 184a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 184b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 185a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 185b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
a. In the Ultracracker Unit, the employer did not install over pressure protection for pressure vessels so as to prevent the pressure inside vessel 185-L from rising above acceptable limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 186a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 186b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 187a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 187b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 188a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 188b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 189a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 189b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 190a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 190b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 191a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 191b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 192a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 192b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 193a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 193b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 194a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 194b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 195a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 195b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 196a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 196b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 197a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 197b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 198a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 198b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 199a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 199b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 200a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 200b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 201a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 201b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 202a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 202b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 203a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 203b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 204a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 204b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 205a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 205b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 206a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 206b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 207a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 207b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 208a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 208b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 209a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 209b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 210a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 210b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 211a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 211b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 212a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 212b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 213a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 213b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 214a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 214b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 215a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 215b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 216a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 216b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 217a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 217b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 218a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 218b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 219a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 219b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 220a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 220b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 221a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 221b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 222a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 222b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 223a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 223b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 224a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 224b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 225a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 225b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 226a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 226b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
a. In the Pipestill 3B Unit, the employer did not install over pressure protection for pressure vessels so as to prevent the pressure inside vessel 423-F from rising above acceptable limits.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 227a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 227b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 228a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 228b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 229a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 229b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 230a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 230b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 231a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 231b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 232a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 232b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 233a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 233b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 234a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 234b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 235a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 235b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 236a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 236b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 237a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 237b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 238a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 238b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 239a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 239b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 240a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 240b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 241a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 241b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 242a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 242b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 243a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 243b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 244a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 244b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 245a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 245b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 246a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 246b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 247a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 247b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 248a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 248b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 249a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 249b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 250a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 250b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 251a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 251b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 252a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 252b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 253a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 253b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 254a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 254b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 255a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 255b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 256a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 256b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 257a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 257b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 258a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 258b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 259a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 259b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 260a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 260b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 261a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 261b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 262a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 262b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 263a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 263b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 264a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 264b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 265a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 265b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 266a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 266b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 267a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 267b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 268a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 268b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 269a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 269b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 270a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 270b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels, including documenting that each pressure vessel has been evaluated and is protected by pressure-relieving device(s) in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and PressureVessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installations of overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 271a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 271b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 272a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 272b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 273a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 273b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 274a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 274b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 275a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 275b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 276a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 276b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 277a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 277b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 278a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 278b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 279a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 279b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 280a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 280b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 281a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 281b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 282a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 282b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 283a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 283b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 284a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 284b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 285a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 285b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 286a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 286b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 287a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 287b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 288a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 288b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 289a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 289b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 290a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 290b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 291a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 291b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 292a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 292b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 293a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 293b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 294a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 294b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 295a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 295b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 296a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 296b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 297a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 297b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 298a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 298b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 299a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 299b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 300a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 300b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 301a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 301b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 302a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 302b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 303a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 303b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 304a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 304b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 305a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
a. In the Pipestill 3B Unit, the employer did not fully consider and address the adequacy of over pressure protection on pressure vessels, as required by recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. Pressure vessel 507-C (SS)/508-C (TS) was not protected against overpressure for identified relief scenarios in that its pressure relief device, 235R, was not adequate to prevent the pressure inside the vessel from rising above acceptable limits for identified relief scenarios.
Citation 1 Item 305b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 306a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 306b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 307a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 307b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 308a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 308b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 309a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 309b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 310a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 310b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 311a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 311b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 312a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 312b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 313a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 313b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 314a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 314b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 315a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 315b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 316a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 316b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 317a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 317b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 318a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 318b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 319a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 319b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 320a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 320b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident.
Citation 1 Item 321a Type of Violation: Willful
29 CFR 1910.119(d)(3)(ii): The employer does not document that equipment complies with recognized and generally accepted good engineering practices.
Citation 1 Item 321b Type of Violation: Willful
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits [defined by the process safety information in paragraph (d) of 29 CFR 1910.119] before further use or in a safe and timely manner.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standards for all pressure vessels in the refinery, including documentation that each pressure vessel is evaluated and protected by pressure-relieving device(s) that is appropriate for the vessel in accordance with recognized and generally accepted good engineering practices, such as the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 322 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 323 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 324 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 325 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 326 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 327 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 328 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 329 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 330 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 331 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 332 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 333 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 334 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 335 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 336 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 337 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 338 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 339 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
a. In the Ultracracker Unit, the employer did not maintain written process safety information documenting process equipment for pressure vessels requiring design specification documentation, such as U-1 reports, original construction drawings, and/or engineering evaluations. Pressure vessel 119 Filter #1 did not have adequate design specification documentation to determine relief system design and design basis.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 340 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 341 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 342 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 343 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 344 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 345 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 346 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 347 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 348 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 349 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 350 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 351 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 352 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 353 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard. Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 354 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 355 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 356 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 357 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 358 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 359 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 360 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 361 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 362 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 363 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 364 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 365 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 366 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 367 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 368 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 369 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 370 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 371 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 372 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 373 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 374 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 375 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 376 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 377 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 378 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
a. In the Pipestill 3B Unit, the employer did not maintain written process safety information documenting process equipment for pressure vessels requiring design specification documentation, such as U-1 reports, original construction drawings, and/or engineering evaluations. Pressure vessel 472-CB (SS), Seal Oil Cooler did not have adequate design specification documentation to determine relief system design and design basis.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 379 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 380 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 381 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 382 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 383 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 384 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 385 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 386 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 387 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 388 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 389 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 390 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 391 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 392 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 393 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 394 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 395 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 396 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 397 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 398 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 399 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 400 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 401 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 402 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 403 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 404 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 405 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 406 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 407 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 408 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 409 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 410 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 411 Type of Violation: Willful
29 CFR 1910.119(d)(3)(i): The employer does not maintain information pertaining to the equipment in the process, including the information specified in 29 CFR 1910.119(d)(3)(i) paragraphs (A) through (H).
Pursuant to 29 CFR 1903.19, within ten (10) calendar days after the abatement date, the employer must submit documentation that it has abated the violation. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance throughout the refinery with the standard including steps to assure that it has written and accurate process safety information for all pressure vessels at the refinery. The abatement plan shall establish dates during the next three months when surveys shall be completed and the information shall be finally compiled. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 412 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 413 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 414 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 415 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 416 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 417 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 418 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 419 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 420 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 421 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 422 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 423 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 424 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 425 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 426 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 427 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 428 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 429 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 430 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 431 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 432 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 433 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 434 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 435 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 436 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 437 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 438 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Citation 1 Item 439 Type of Violation: Willful
29 CFR 1910.119(f)(1)(ii): The employer does not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and that include the applicable operating limits.
Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard throughout the refinery.
Date by Which Violation Must be Abated: 11/30/2009
Proposed Penalty: $ 70000.00
Mark R. Briggs