U.S. Department of Labor
Occupational Safety and Health Administration
Houston South Area Office
17625 El Camino Real, Suite 400
Houston, TX 77058
Phone: (281)286 0583 FAX: (281)286 6352
After the original inspection, a Citation(s) was issued to you in accordance with the provisions of the Occupational Safety and Health Act of 1970 (the Act), notifying you of certain violations of the Act and the dates by which they were to be abated. Based upon reinspection, it is alleged that you have failed to abate the violation(s) listed below within the time prescribed, and the following additional penalties are proposed. The additional penalty is computed by multiplying a daily penalty times the number of days the violation(s) remained unabated. You are to notify the Area Director in writing of the date and nature of the corrective action taken. If you do not abate the violation(s), further penalties may be proposed and other enforcement action to compel abatement may be taken under section 11(b) of the Act.
You are further notified that you must pay the ADDITIONAL PENALTY unless you inform the Area Director in writing that you intend to contest the Notification or the Additional Penalty within 15 working days (excluding weekends and Federal holidays) from your receipt of this notification. If you do not contest within 15 working days after receipt, the Notification and the additional penalties will become the final order of the Occupational Safety and Health Review Commission and may not be reviewed by any court of agency. Issuance of this Notification does not constitute a finding that a violation of the Act has occurred unless there is a failure to contest as provided for in the Actor, if contested, unless the Notification is affirmed by the Review Commission.
Make your check or money order payable to "DOL-OSHA". Please indicate the Inspection Number on the remittance.
| U.S. Department of Labor Occupational Safety and Health Administration |
![]() |
NOTICE TO EMPLOYEES OF INFORMAL CONFERENCE
An informal conference has been scheduled with OSHA to discuss the citation(s) issued on 10/29/2009. The conference will be held at the OSHA office located at Houston South Area Office, 17625 El Camino Real, Suite 400, Houston, TX, 77058 on _____________ at _____________. Employees and/or representatives of employees have a right to attend an informal conference.
Failure to Abate Item 1
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 2
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 3
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 4
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 5
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 6
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 7
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 8
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 9
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 10
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 11
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 12
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 13
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 14
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 15
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 16
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 17
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 18
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 19
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 20
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 21
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 22
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 23
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 24
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 25
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 26
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 27
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 28
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to conduct an audit of the adequacy of pressure relief for individual pieces of equipment in each covered process unit for conformance with best practices in the industry, i.e., recognized and generally accepted good engineering practices (RAGAGEP), as required by the terms of the SETTLEMENT AGREEMENT entered In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom. Had BP performed the study in accordance with RAGAGEP and the Settlement Agreement it would have identified and been able to correct the numerous pressure relieving devices that were outside acceptable limits.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that provides for the repair or replacement of pressure relief equipment that does not comply with RAGAGEP within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 29
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 30
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
a. In the Coker B Unit, the employer failed to ensure mitigation of fire, explosion, and toxic hazards that the employer identified as "residual risk" for process equipment F-201B that was designated as TCACP Database Unique Record Number 422, either identified as requiring additional residual risk reduction which was not allocated to a safety function, or was designated for a Safety Instrumented Function which was not implemented, i.e., installed and commissioned.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 31
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 32
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 33
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 34
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 35
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 36
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 37
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 38
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 39
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 40
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 41
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 42
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 43
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 44
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 45
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 46
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 47
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 48
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 49
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 50
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 51
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 52
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 53
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 54
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 55
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 56
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 57
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 58
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 59
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 60
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 61
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 62
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 63
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 64
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 65
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 66
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 67
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 68
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 69
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 70
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 71
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 72
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 73
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 74
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 75
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 76
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 77
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 78
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 79
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 80
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 81
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 82
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 83
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 84
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 85
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 86
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 87
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 88
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 89
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 90
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 91
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 92
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 93
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 94
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 95
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 96
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 97
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 98
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 99
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 100
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 101
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 102
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 103
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 104
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 105
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 106
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 107
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 108
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 109
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 110
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 111
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 112
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 113
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 114
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 115
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 116
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 117
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 118
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 119
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 120
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 121
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 122
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 123
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 124
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 125
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 126
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 127
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 128
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 129
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 130
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 131
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 132
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 133
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 134
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 135
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 136
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 137
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 138
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 139
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 140
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 141
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 142
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 143
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 144
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 145
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 146
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 147
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 148
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 149
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 150
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 151
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 152
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 153
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 154
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 155
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 156
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 157
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 158
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 159
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 160
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 161
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 162
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 163
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 164
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 165
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 166
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 167
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 168
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 169
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 170
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 171
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 172
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 173
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 174
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 175
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 176
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 177
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 178
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 179
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 180
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 181
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 182
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 183
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 184
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 185
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 186
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 187
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 188
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 189
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 190
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 191
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 192
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 193
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 194
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 195
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 196
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 197
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 198
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 199
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 200
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 201
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 202
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 203
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 204
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 205
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 206
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 207
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 208
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 209
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 210
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 211
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 212
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 213
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 214
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 215
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 216
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 217
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 218
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 219
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 220
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 221
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 222
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 223
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 224
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 225
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 226
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 227
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 228
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 229
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 230
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 231
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 232
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 233
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 234
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
a. In the Ultraformer 7 Unit, the employer failed to ensure mitigation of fire, explosion, and toxic hazards that the employer identified as "residual risk" for process equipment B-401A that was designated as LOPA Action Item Recommendation Number R2008063-0013, either identified as requiring additional residual risk reduction which was not allocated to a safety function, or was designated for a Safety Instrumented Function which was not implemented, i.e., installed and commissioned.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 235
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 236
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 237
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 238
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 239
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 240
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 241
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 242
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 243
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 244
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 245
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 246
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 247
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 248
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 249
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 250
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 251
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 252
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 253
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 254
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 255
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 256
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 257
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 258
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 259
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 260
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 261
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 262
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 263
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 264
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 265
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 266
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 267
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 268
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 269
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Failure to Abate Item 270
For a period of thirty (30) or more days, including thirty (30) days from September 22, 2009, the employer failed to fully address PSM Expert recommendation number PSM-48, also known as BP Products Index PHM-TCR-2006-005-048, and related recommendations, to implement the standard for Safety Instrument Systems ("SIS standard"), ANSI/S84.00.01-2004, entitled: Functional Safety: Safety Instrumented Systems for Process Industry Sector, as soon as possible. Implementation was required by the SETTLEMENT AGREEMENT In Re Inspection of BP Products North America, Inc. and its Successors, Inspection Nos. 308314640, 308314988, 308314632, 308316942, 308316322, 308316314, 308314996, 308315019, 308316751, signed September 22, 2005, and made part of the citations issued to the employer on September 22, 2005, and the Final Order resulting therefrom.
Pursuant to 29 C.F.R. 1903.19, the employer must submit documentation showing that it has corrected the violation. Within thirty (30) days, the employer shall submit an abatement plan that assures the identification of all equipment, systems, and critical processes where it needs to implement the SIS standard throughout the refinery, including but not limited to, the allocation of residual risk to safety functions which are SIS and non-SIS, i.e., other technology related systems or external risk reduction facilities. Additionally, the abatement plan shall specify dates by which the installation and operation of SIS, SIF, or non-SIS will be completed within one hundred and twenty (120) days from the date of this notice. Once the plan has been fully implemented, the employer must submit certification of its full compliance with this requirement.
The penalty is calculated by multiplying a daily penalty of $7,000 by thirty (30) days, the period that the employer failed to correct the violation.
Additional Penalty: $ 210000.00
Mark R. Briggs
Area Director