Case Study 5: Sour Water Pipeline Repairs


Incorrect. Here, the employer has not met the requirements.

Prior to the start of work, the authorized employees did not personally verify the isolation of the two sour water valves at the tank farm, as required by 29 CFR 1910.147(d)(6) and (f)(3)(ii)(D).