Slide 33

Slide 33


TEXT VERSION OF SLIDE:

  • Title: This did not start this way
  • Type: Text Slide
  • Content:
    • Prior to April of 1999 the Miller Park project was at 27% of premium dollars for injuries at the site.
    • As the need to accelerate the production to make the opening day deadline, a dispute over site arose and the then safety director left.
    • In the next few months there were serious falls, dropped loads and the death of three workers.