  • Title: MILLER PARK STADIUM -- RESULTS
  • Type: Text Slide with Two Lists
  • Content:
    • Original budget
    • $ 322M
    • Final Cost: $ 850M+?
      • - $413.9M (construction)
      • - $100M (repairs)
      • - $27-99M (jury awards)
      • - $330.8M (interest on bonds)

    Litigation is ongoing with over a Hundred Million Dollars in claims still unresolved.

    [Includes clipart image of stadium.]

    Speaker Notes:

    The original budget for Miller Park was $322M --

    Due to the crane collapse -- the final cost, which is still unknown, was $413.9M for construction, $100M for repairs from the collapse (insured). In addition -- the insured will have between $27M and $99M for jury award to beneficiaries. Also, the interest on the bonds turned out to be more than the original construction cost.