Slide 34

TEXT VERSION OF SLIDE:
- Title: MILLER PARK STADIUM -- RESULTS
- Type: Text Slide with Two Lists
- Content:
- Original budget
- $ 322M
- Final Cost: $ 850M+?
- - $413.9M (construction)
- - $100M (repairs)
- - $27-99M (jury awards)
- - $330.8M (interest on bonds)
Litigation is ongoing with over a Hundred Million Dollars in claims still unresolved.
[Includes clipart image of stadium.]
Speaker Notes:
The original budget for Miller Park was $322M --
Due to the crane collapse -- the final cost, which is still unknown, was $413.9M for construction, $100M for repairs from the collapse (insured). In addition -- the insured will have between $27M and $99M for jury award to beneficiaries. Also, the interest on the bonds turned out to be more than the original construction cost.