Slide 41

Slide 41


TEXT VERSION OF SLIDE:

  • Title: GREAT AMERICAN BALLPARK -- RESULTS
  • Type: Text Slide
  • Content:
    • After 1.2 million construction hours, a job-lost time rate of 0.8
    • Estimated savings from Owner Control Insurance Program (July 1999-May 2003) was $3.125 million (project is on-going until July 2005)