- Title: ABBOTT RESULTS
- Type: Text Slide
- Content:
- X pump line manually intensive
- 2000: 4 WC incidents $122.0 K (total)
- 2001: 1 WC incident $22.0 K
- 2002: 1 WC incident $0.8 K
- 2003: 1 WC incident $2.5 K
- Ergonomics were incorporated in at the design phase of the project
- X pump line manually intensive