    • X pump line manually intensive
      • 2000: 4 WC incidents $122.0 K (total)
      • 2001: 1 WC incident $22.0 K
      • 2002: 1 WC incident $0.8 K
      • 2003: 1 WC incident $2.5 K
    • Ergonomics were incorporated in at the design phase of the project