Slide 52

Slide 52


TEXT VERSION OF SLIDE:

  • Title: Before and After
  • Type: Text Slide With Images
  • Content:

    PROBLEM: Employees were required to use a jack hammer to remove and break up air set core from castings. Stressors included vibration & bending over for 4-8 hrs/day.

    SOLUTION: A core lump crusher has been purchased to eliminate the use of the jack hammer.

    COST: $51,000

    COST RECOVERY TIME: 8-12 months

    BENEFITS: Eliminated strain from repetition, vibration and poor posture, and increased productivity and recovery rate.